Brightline West launched field work in January 2024 along the I-15 Corridor from Las Vegas to Rancho Cucamonga in preparation for groundbreaking. These Four (4) parcels totaling 34.75 ac. +/-, are Zoned Planned Industrial (IP) on Morro Rd. just east of the highly anticipated Brightline West High Speed Rail Train Station on Dale Evans Pkwy. There is a Well on the 4.85 ac parcel with power connected to site. Buyer to verify all utilities and allowed uses within the Planned Industrial (I-P) Zoning District with the Town of Apple Valley.